AI Infrastructure Readiness Decision Guide

Questions, evidence and red flags to review before approving infrastructure for AI workloads.

Questions · Evidence · Red flags · Executive output

Questions to ask

Do not approve until the answers are traceable.

Each answer should identify its source, owner, confidence level and impact on the decision.

01. Which AI workloads are being approved and how will demand grow?

Document the answer, assumptions and validation action.

02. Is power capacity available at the required density?

Document the answer, assumptions and validation action.

03. Can cooling support the load under realistic operating conditions?

Document the answer, assumptions and validation action.

04. Are network, storage and latency assumptions validated?

Document the answer, assumptions and validation action.

05. What resilience and recovery level is required?

Document the answer, assumptions and validation action.

06. Which data-sovereignty and security constraints shape hosting choices?

Document the answer, assumptions and validation action.

07. Can the operating team support the target architecture?

Document the answer, assumptions and validation action.

Evidence pack

Minimum evidence to collect.

EvidenceWorkload and growth profile

Check recency, completeness and ownership.

EvidenceFacility capacity baseline

Check recency, completeness and ownership.

EvidenceRack-density and cooling model

Check recency, completeness and ownership.

EvidenceNetwork and storage architecture

Check recency, completeness and ownership.

EvidenceResilience, security and operating model

Check recency, completeness and ownership.

Red flags

Signals that should trigger a review.

Red flag 01

Compute selection precedes workload definition

Address the cause before treating the recommendation as approval-ready.

Red flag 02

Average power values are used instead of peak and growth scenarios

Address the cause before treating the recommendation as approval-ready.

Red flag 03

Cooling analysis ignores rack-level density

Address the cause before treating the recommendation as approval-ready.

Red flag 04

Recovery and operational support are treated as later topics

Address the cause before treating the recommendation as approval-ready.

Red flag 05

The business case compares acquisition cost but not total operating cost

Address the cause before treating the recommendation as approval-ready.

Executive output

The decision should produce more than verbal approval.

01Decision and scope

What is approved, deferred or excluded.

02Assumptions and risks

Remaining uncertainty and control actions.

03Roadmap and owners

Sequence, owners, milestones and dependencies.

04Governance cadence

Reviews, KPIs, escalation and exit criteria.

Related solution

AI InfraGrade™

The guide helps prepare the decision. A formal recommendation requires context-specific scope, evidence and validation.